Installing and Maintaining the E1200i System 19
This chapter describes factors to consider before installing your E1200i system. The following topics are
discussed:
Site Selection Criteria on page 19
Rack Mounting on page 20
Cabinet Placement on page 20
Power on page 20
Fans and Airflow on page 21
Storing Components on page 22
For complete E1200i System Specifications, refer to Appendix D, on page 91.
Site Selection Criteria
Before you begin the installation process, make sure that the area where you intend to install your E1200i
meets the following safety requirements.
Select a site:
In a restricted access area.
In a dry, clean, well-ventilated and temperature-controlled room, away from nearby heat sources such
as hot air vents or direct sunlight.
Away from sources of severe electromagnetic noise.
Near an adequate power source. Connect the E1200i to the appropriate branch circuit protection as
defined by local electrical codes.
Means of power disconnect must be located near the equipment
Position in a rack with adequate space in the front and rear, and sides of the unit for proper ventilation,
access to cables, and maintenance access. Allow at least 18 inches in the front and 20 inches in the rear
of the rack for ventilation. If placing the chassis in a cabinet, ensure that there is enough clearance
between the closed cabinet door and the cables in the cable management system on the chassis.
Chapter 3 Site Preparation
Caution: Lift the E1200i chassis either from the bottom or by the handles provided with the front
shipping cover. Lifting by the chassis shelves or fan tray openings will cause chassis damage. Do
not remove the protective front shipping cover until the chassis is secured in the equipment rack.